Is it more cost-effective to hire a new employee or work your existing staff overtime? The answer can be found in analyzing the employee productivity and workload.

For the purpose of this article, our analysis is based on the assumption that 5 percent of straight paid hours is considered an acceptably moderate amount of overtime (OT). To calculate an annual OT goal, first determine the total annual paid work hours per employee:

40 hours/week x 52 weeks/year = 2,080 annual paid work hours

Next, calculate the 5 percent annual OT goal:

2,080 x 0.05 = 104 annual OT hours

On average, the 104 hours annual OT goal amounts to two hours per week, per employee.

Breaking Down the Hours

The next step is calculating the total actual at-work hours. This calculation involves two basic steps.

  1. Determine employee personal time — vacations, sick-leave, training, and holidays. Personal time is not considered at-work time. In general, annual personal time per employee totals 40 days or 320 hours (eight hours per day). Personal time hours are then subtracted from the 2,080 total annual paid hours:
    2,080 – 320 = 1,760 at-work hours
  2. Deduct time spent on indirect activities such as paperwork, toolbox talks, diagnostic times, restroom and coffee breaks, and cleanup time. This nonproductive time totals approximately two hours per day, five days a week, for the 47 weeks of at-work time or 470 hours.
    1,760 at-work hours – 470 indirect activity hours = 1,290 potential productive hours

Determining Productivity

To determine hours of productivity per employee, we use two work classifications: scheduled and unscheduled. The productivity of each classification is calculated, and then combined for an annual total of productive hours per employee.

Scheduled work comprises defined, routine tasks completed in a specific time frame. As such, each hour of scheduled work equals one hour of productivity. We estimate one-third of our shop work is scheduled.

1,290 potential productive hours ÷ 3 = 430 hours of productivity from scheduled work

1,290 – 430 = 860 hours of unscheduled work

Unscheduled work usually takes three times longer to complete than scheduled work because it involves different, often nonroutine tasks. The 860 hours of unscheduled work realizes 287 hours of actual productivity:

860 ÷ 3 = 287 hours of unscheduled work

For the purposes of this article, our shop employees are paid $15 per hour — $30,000 average annual pay. Benefits, about 33 percent of total wages — $10,000 or $200 per week, must be added. Factor in Social Security, retirement, 401K matching, and health benefits and the cost of a $30,000 employee actually amounts to $50,000 per year.

Determining the direct labor rate charged customers is a two-step calculation. First, the total paid hours of 2,080 are divided by the 717 total productive hours:

2,080 ÷ 717 = 3 (approximately)

Second, multiply three by the $15 per hour employee rate:

3 x $15 = $45 direct labor rate

Extra Hours vs. Extra Employees

At what amount of OT work does hiring a new employee become cost-effective? With the target total of 717 annual productive hours per employee, a total of seven employees working the suggested maximum two OT hours per week comes closest to the goal:

2 hours OT/employee x 7 employees x 52 weeks = 728 annual productive hours

Of course, fewer employees working more OT hours will also approach the 717-hour productive goal. If we increase the 430 hours of scheduled work per employee, that employee is accomplishing more productive work within the 1,260-hour window. Each hour of increased scheduled work reduces three hours of unscheduled work to one.

Calculating productive hours, using a target of 5 percent OT per employee, allows us to evaluate workload — to operate more productively in-house rather than increase our staff.

When increasing staff becomes cost-effective in terms of productivity, we must also realize that a new shop team member does not immediately provide 717 hours of net productivity within the 1,290-hour window. The learning curve a new employee experiences means all work that employee performs must be considered unscheduled, the less productive shop work classification.

One-third of an employee’s total potential productive hours — 430 — is the net productivity that can be expected of a new employee rather than 717 total net hours the experienced staff member produces.

The deciding factors in our OT versus new employee analysis are employee costs and facility overhead, which includes work space, tools, heat, light, electricity, uniforms, supplies, employee benefits, personal off-time, training, productive time, and other direct or indirect employee costs. The cost of a new hire includes the indirect costs and his or her actual productive costs.

Benchmark Against 5 Percent Overtime Goal

The 5-percent OT is a benchmark to measure what we are doing, how we can do it better, and if the workload is increasing. For a workload that’s temporarily increased, it’s more productive to use in-house staff to cover the temporary peak work with OT — or vendor it out and improve in-house staff productivity with scheduled work. Unscheduled work is a good choice to vendor out if the vendor can do it more cost-effectively.

In summary, use the 5-percent OT goal to cover immediate need and evaluate future options. The 5-percent goal is also a useful "flag" to proactively pay attention to a symptom, signaling us to examine the root cause and initiate corrective action.

Use the following rule of thumb:

  • Measure, watch, and pay attention.
  • Measure what’s meaningful.
  • Watch everything.
  • Pay attention to the key symptoms.

Originally posted on Government Fleet

About the author
John Dolce

John Dolce

Fleet Manager Consultant

John Dolce is a fleet manager consultant and trainer. He can be reached at (973) 226-9061, and fax (973) 226-7982.

View Bio